Independent production-line planning platformStart project assessment
PLASTIC PACKAGING · FACTORY PLANNING

Build the right
bottle factory.

From bottle concept to a bankable production plan. Compare processes, capacities, equipment, utilities and project economics before you invest.

MaterialsPET · HDPE · PP
ScopeBottle to packed product
Decision focusCAPEX · OPEX · ROI
01 / 06
A decision platform, not a machine catalog

Start with the bottle.
Engineer the line around it.

The wrong process or an unbalanced line can lock a project into high scrap, excess labor and poor margins. We organize the technical and commercial decisions in the order an investor actually needs them.

See the planning method
3
Core materialsPET · HDPE · PP
6
Application familiesOne clear starting point
4
Decision layersProduct to ROI
Choose by application

Plastic bottle
production lines

Each solution starts from the product, packaging standard and target output — then maps the right forming process and downstream equipment.

The planning method

Four decisions.
One coherent line.

Engineering discipline before quotation prevents expensive changes after equipment is ordered.

01

Define the bottle

Material, volume, neck, weight and product compatibility.

02

Select the process

ISBM, stretch blow molding or extrusion blow molding.

03

Balance the line

Match molding, filling, labeling and packing capacities.

04

Validate the project

Utilities, labor, layout, CAPEX, OPEX and payback.

PROCESS OPTIONSInjection Stretch Blow MoldingTwo-stage PET Stretch BlowExtrusion Blow Molding
Investment intelligence

Machine price is only one line in the business case.

A bankable bottle factory model connects output with real operating conditions.

  • 01 Line capacity and product mix
  • 02 Resin, preform and closure strategy
  • 03 Power, air, cooling and water demand
  • 04 Labor, scrap, maintenance and payback
Estimate my project
PROJECT MODEL / 001Cost structure
100%PROJECT VIEW
Production equipment45–60%
Utilities & auxiliaries15–25%
Facility & installation15–25%
Start-up & working capital10–15%
Illustrative only. Actual structure changes by product and country.
SEO knowledge center

Answers before
the quotation.

Built around the questions factory investors search, compare and bring to technical meetings.

Project assessment

Tell us the bottle.
We’ll map the line.

Share five project inputs. You’ll have a cleaner technical discussion and a more useful preliminary concept.

What you receiveRecommended process · line scope · missing inputs · next-step roadmap
By submitting, you agree to be contacted about this project.